Aurora's zoning code was never written for hyperscale data centers. A moratorium is the responsible pause needed to fix that — and the council members who voted against it owe their constituents an explanation.

Accountability

Council Members Who Voted Against the Moratorium

Despite overwhelming community opposition, the following Aurora City Council members voted against the data center moratorium — choosing to side with developers over the health and safety of their constituents.

Rob Andrews

Ward I

Francoise Bergan

Ward II

Curtis Gardner

Ward III

Stephanie Hancock

Ward IV

Angela Lawson

At-Large

Make Your Voice Heard

Contact your council member directly and let them know this community is watching. These names will be on the ballot — keep them in mind when you vote. They chose developers over their constituents. Use the contacts in the Resources directory to reach them now.

Policy & Zoning Reform

Aurora's UDO Must Be Updated for the Data Center Era

Aurora's Unified Development Ordinance was written before hyperscale data centers existed as an industrial category. The city currently has no zoning classification, no use-specific standards, and no regulatory framework designed for facilities of this scale and impact. That gap must be closed — not after approval, but before any new data center is permitted in or near a residential area.

Hyperscale Facilities Belong in Heavy Industry

Any data center consuming more than 50 MW of power operates at a scale comparable to a large manufacturing plant or industrial processing facility. The Trident proposal alone is projected to draw over 500 MW — ten times that threshold. At this power draw, the facility generates industrial-grade noise, heat, diesel exhaust, and electromagnetic emissions that are fundamentally incompatible with residential proximity. Aurora's UDO should formally classify any data center exceeding 50 MW as heavy industry, with all the setback, buffer, and permitting requirements that classification entails.

Data Centers Need Their Own Zoning Category

Data centers are not office parks, warehouses, or light industrial facilities — yet Aurora's current UDO treats them as if they were. A dedicated zoning classification would allow the city to set use-specific standards for power consumption tiers, minimum lot size, required setbacks from residential zones, noise emission limits in dB(A), dB(C), and dB(Z), cooling system discharge requirements, backup generator fuel storage, and visual screening. Without a dedicated category, every new application is evaluated against standards written for entirely different land uses — a process that systematically underestimates real community impact.

Mandatory Setbacks from Homes, Schools & Care Facilities

The UDO currently has no minimum separation distance between a data center and a residential neighborhood, school, or assisted living facility. Other cities and counties that have updated their codes in response to hyperscale development have established setbacks ranging from 500 feet to over half a mile for the largest facilities. Aurora should adopt science-based setback minimums that account for noise propagation, EMF radiation, diesel exhaust dispersion, and visual impact — scaled to the facility's power consumption tier.

Cumulative Impact Review Must Be Required

When multiple data centers are proposed or operating in the same geographic corridor, each new application must be evaluated against the cumulative industrial baseline — not in isolation. Aurora's UDO should require a cumulative impact assessment for any data center application within a defined radius of an existing or approved facility. This assessment should cover combined power demand on the grid, aggregate diesel generator emissions, total water consumption, and compounded noise levels — the same standards applied to other forms of industrial clustering.

Codified Environmental Performance Standards

The UDO should establish binding environmental performance standards specific to data centers: maximum water usage effectiveness (WUE) ratios for cooling systems, generator emission limits tied to EPA Tier 4 Final standards as a minimum (not Tier 2), stormwater and wastewater discharge requirements, mandatory on-site air quality monitoring with public reporting, and requirements for renewable energy sourcing above a defined power consumption threshold. Voluntary commitments from developers are not enforceable — only codified standards protect residents.

Low-Frequency Noise Standards Must Be Codified

Aurora's current noise ordinance measures only dB(A) — a weighting scale that filters out the low-frequency hum produced by data center cooling equipment and power infrastructure. The UDO must be updated to include dB(C) and dB(Z) limits for industrial facilities near residential zones, with mandatory pre-construction baseline measurements, continuous post-construction monitoring, and enforceable thresholds that trigger operational restrictions if exceeded. Without these standards, residents have no legal recourse for the chronic low-frequency noise that data centers produce 24 hours a day, 365 days a year.

What Aurora Must Do

The City of Aurora should immediately commission a comprehensive UDO update that creates a dedicated data center zoning classification, establishes power-tiered heavy industry designation for facilities over 50 MW, sets mandatory setbacks from sensitive land uses, requires cumulative impact review, and codifies binding environmental and noise performance standards. This update should be developed with full public participation and completed before any new data center application is accepted for review. Approving projects under outdated standards — and then promising to update the code later — is not responsible governance. It is a pattern that leaves residents permanently behind.

The Case for a Pause

Why a Moratorium Is Necessary

Mitigations alone are not enough when the foundational science, regulatory frameworks, and municipal codes needed to evaluate and govern data center impacts have not yet been established. Aurora must pause new approvals until the community, regulators, and city planners have the tools and knowledge to make fully informed decisions. The following gaps make that case unavoidable.

Pollution Ramifications Are Not Fully Understood

The full scope of pollution from large-scale data center operations — including diesel exhaust from backup generators, chemical discharge from cooling systems, and long-term soil and groundwater contamination — has not been comprehensively studied in the context of this site. Approving construction before that science is complete means accepting unknown and potentially irreversible harm to our community.

Water Usage & Drainage Impacts Remain Unquantified

Evaporative cooling systems at this scale consume millions of gallons of water annually. The downstream effects on municipal water supply, stormwater drainage, and wastewater infrastructure in this semi-arid region have not been adequately assessed. Closed-loop systems still require periodic flushing and discharge — and in other cities, that process has contaminated local water supplies. Aurora deserves a full hydrological impact study before any approval moves forward.

EMF Radiation Is Not Contained

Data centers generate significant electromagnetic field (EMF) radiation from high-voltage power infrastructure, server equipment, and transmission lines. Unlike other industrial pollutants, EMF is not contained by walls or fences — it radiates outward into surrounding neighborhoods, schools, and homes. There are no current Aurora UDO provisions that establish setback distances, shielding requirements, or exposure limits for EMF from data center operations. This gap must be closed before any approval is granted.

We Are Already in an Ozone Non-Attainment Area

The Denver-Aurora metro area is classified by the EPA as a "Serious" ozone non-attainment area — meaning our air quality already fails federal health standards. The 28 Tier 2 diesel generators proposed for the Trident facility emit NOx, a primary precursor to ozone formation. Adding this industrial load to an already-failing airshed is not a mitigation problem — it is a fundamental incompatibility with public health that no permit condition can fully resolve. A moratorium gives regulators time to evaluate whether any approval is appropriate at all.

Low-Frequency Noise Standards Are Absent from Aurora's UDO

Data centers produce persistent low-frequency noise measured in dB(C) and dB(Z) — weighted scales that capture the deep, penetrating hum that standard dB(A) measurements miss entirely. This type of noise travels through walls, floors, and ground, and has been linked to chronic health effects including sleep disruption, cardiovascular stress, and cognitive impairment. Unlike higher-frequency sound, it cannot be effectively mitigated with standard acoustic barriers once a facility is built.

Aurora's Unified Development Ordinance (UDO) currently contains no provisions governing dB(C) or dB(Z) emissions from industrial facilities near residential zones. There are no codified setback distances, no maximum exposure thresholds, and no monitoring or enforcement mechanisms specific to low-frequency industrial noise. These regulations must be researched, drafted, publicly reviewed, and formally adopted into the UDO before any data center of this scale is permitted adjacent to homes, schools, and assisted living facilities.

The Bottom Line

A moratorium is not a permanent "ban." It is a responsible pause — the minimum standard of care owed to residents who will live with these impacts for decades. Until the pollution science is complete, water impacts are quantified, EMF exposure standards are established, ozone non-attainment is addressed, and low-frequency noise regulations are codified in the UDO, Aurora should not approve another data center in or near residential areas.